At the Central Library, ceiling work near the 1st floor BIBLA Study Space will be carried out as part of air conditioning system construction during the following period.
Protective coverings will be installed in the work area, and seating and bookshelves within these covered areas will be unavailable.
Due to the high ceiling in the work area, high-lift equipment will be used.
We apologize for any inconvenience and appreciate your understanding.
Period: From May 18 (Mon.) to June 22 (Mon.), 2026 (scheduled)
Work Area:Near the BIBLA Group Space in the Central Library (see map)
- During the work period, the Library Hall will be open as a study space on days when it is not reserved.